Upload
34

Omega Morgan

  • Omega Morgan at the 2015 NW Machine Tool Expo - Duration: 77 seconds.

    • 2 months ago
    • 50 views
    The Northwest Machine Tool Expo is a regional biennial event for the machining and manufacturing industries. The event features free educational sessions and an exhibit floor showcasing the latest ...
  • Omega Morgan Moves 800 Ton Oil Rig - Duration: 97 seconds.

    • 3 months ago
    • 169 views
  • Module Load Timelapse - Duration: 25 seconds.

    • 3 months ago
    • 192 views
    Time-lapse of Omega Morgan loading at 235,000 pound module.
  • Omega Morgan Module Transportation - Duration: 24 seconds.

    • 6 months ago
    • 111 views
    Omega Morgan preparing to transport a 158,000 lbs 61' long. 14'6" wide 12'6" tall module in Everette, Wa.
  • First Haul of 2015 - Duration: 20 seconds.

    • 6 months ago
    • 205 views
    Short video of Omega Morgan's first snowy haul of 2015.
  • Omega Morgan Onsite Transformer Moves - Duration: 10 seconds.

    • 9 months ago
    • 697 views
    Omega Morgan provided onsite transportation of three identical transformers in Central Ferry, WA for BPA in October 2014. Each transformer is 135,000 pounds and is 12' 1" in length, 12' wide and 14...
  • 144-Car Ferry Superstructure Transit to Hull - Duration: 52 seconds.

    • 1 year ago
    • 170 views
    On March 5, 2013, Omega Morgan collaborated with Vigor Industrial to move the 270'x80'x45' superstructure of the M/V Tokitae onto the 362'x83'x24' hull, while both structures were in floating drydo...
  • Alaska Ferry Engine Replacement - Duration: 12 minutes.

    • 1 year ago
    • 585 views
    Timelapse of Omega Morgan collaborating with Vigor Industrial on the AMHS ferry, M/V Columbia, to remove the 100-ton old engines and replace with them with brand new ones. A gantry crane and slide ...
  • 125-ton Melter Load-out to 125-ton dual-lane loader - Duration: 6 minutes, 24 seconds.

    • 1 year ago
    • 184 views
    October 2010. Omega Morgan sets hydraulic slide gear and slides 125-ton melter assembly to 125-ton dual-lane loader for transport.
  • Skagit River Bridge Replacement - Duration: 2 minutes, 53 seconds.

    • 1 year ago
    • 804 views
    Omega Morgan worked on the Skagit River Bridge Replacement Project with Max J Kuney Construction and Parsons Brinckerhoff in Septempber 2013 for WSDOT.
  • Omega Morgan Moves the Keller Ferry March 2013 - Duration: 99 seconds.

    • 2 years ago
    • 1,085 views
    ODOT video featuring Omega Morgan's successful haul of the 116 foot hull of the Washington State Keller Ferry hull from Rainier, OR to Grand Coulee Dam, WA in March 2013.

    About the ferry -
    The Sa...
  • Omega Morgan moves the Sellwood Bridge in Portland, OR on January 19, 2013 - Duration: 2 minutes, 24 seconds.

    • 2 years ago
    • 6,362 views
    Omega Morgan's Vice President of Engineering was the mastermind behind one of the nation's longest and most complex bridge moves. He created the plan to move Portland's Sellwood Bridge in one piece...
  • Sellwood Bridge Move - Duration: 2 minutes, 13 seconds.

    • 2 years ago
    • 76 views
  • Omega Morgan Bow Lake Compactor Installation - Duration: 3 minutes, 35 seconds.

    • 2 years ago
    • 271 views
    Compactor Installation at Lydig's Bow Lake project. Utilized Tri-Lifter Specialized Forklift for Installation.
  • Omega Morgan Dual Lane - Duration: 82 seconds.

    • 3 years ago
    • 2,025 views
    Omega Morgan Dual Lane Transporter hauling a transformer, offloading and uprighting with a gantry, and moving to the pad with a hydraulic skidding system. omegamorgan.com
  • Omega Morgan Mori Seiki Move.mov - Duration: 102 seconds.

    • 3 years ago
    • 1,813 views
    Omega Morgan picked up two Mori Seiki machines from The Port of Seattle, delivered them to the customer's site and installed them for operation. See omegamorgan.com for more information about Omega...
to add this to Watch Later

Add to

Loading playlists...