Upload
1,133

David-Josh Berglund

  • Blazer update - WALL DONE - LED bars - lift kit - new tires and rims

    137 views 1 week ago
    Its been a very long time coming but ive finally completed the wall. Now all thats left is to hook everything up and start playing. I will be doing more updates after its playing along with updates on my mids and highs setup later. Hope you all enjoy the progress and please leave your feedback in the comments below.

    If you wanna check out how it was all installed go check out our DJ Designs page on Facebook and "like" our page please.

    www.facebook.com/DJDesigns Show less
    Read more
  • Uploads Play

    • Blazer update - WALL DONE - LED bars - lift kit - new tires and rims - Duration: 8 minutes, 10 seconds.

      • 1 week ago
      • 137 views
      Its been a very long time coming but ive finally completed the wall. Now all thats left is to hook everything up and start playing. I will be doing more updates after its playing along with updates...
    • Demo / Discussion about "Acoustic Balance" 2 - Duration: 4 minutes, 5 seconds.

      • 2 months ago
      • 103 views
      Giving a demo to a coworker who was a car audio installer at a shop and now does home audio and electronics. He concentrates his installs on sound quality.
    • Demo / Discussion about "Acoustic Balance" 1 - Duration: 3 minutes, 4 seconds.

      • 2 months ago
      • 89 views
      Giving a demo to a coworker who was a car audio installer at a shop and now does home audio and electronics. He concentrates his installs on sound quality.
    • Blazer updates - new motor - 2 18"s 6th order - excessive amperage - clifford alarm - Duration: 10 minutes.

      • 4 months ago
      • 568 views
      New updates showing how the blazer build is coming along. its a slow process but it is coming along well.

      If you wanna check out how it was all installed go check out our DJ Designs page on Faceb...
    • Blazer update - 6th order shell built - 6 c&d 300's - Duration: 6 minutes, 14 seconds.

      • 9 months ago
      • 833 views
      Got the shell built for the 6th order along with 6 c&d 300's installed and power and ground wires ran from front to back.

      EDIT:
      (I changed my mind alot on the design based off what would fit so...
    • NEW BUILD - BLAZER - 2 18" 6th order - ALL CROSSFIRE - Duration: 6 minutes, 49 seconds.

      • 10 months ago
      • 916 views
      Finally made an update video. Sorry its been so long. Life has been crazy since I had the taurus, but I should be making a good comeback finally.

      EDIT:
      (I changed my mind alot on the design base...
    This item has been hidden
Sign in to add this to Watch Later

Add to