  • Another successful job completed by LBS!

    232 views 1 year ago
    Light-weight Building Systems Inc. completes the Deep Deck installation providing a transfer slab that includes drop beams with a 2 hour fire rating. The rebar and shoring installation where also provided by LBS for a completed system install. LBS also supplied and erected the required structural steel for this project. Show less
    Read more
  • Uploads Play all

    • Park City May Update - Duration: 2 minutes, 30 seconds.

      • 1 month ago
      • 19 views
    • Clover Bar Lodge - April update - Duration: 9 minutes, 33 seconds.

      • 2 months ago
      • 18 views
      Light-weight Building Systems Inc. is completing the Supply and Installation of all Structural Steel, Load Bearing Steel Stud LBS walls and one of several non-combustible floor assembly options.

      W...
    • Winnipeg Project Spring Update - Duration: 4 minutes, 52 seconds.

      • 2 months ago
      • 30 views
      The first floor walls and floor were installed and second floor was poured within two weeks! Thanks to the hard working LBS crew.
      load bearing steel stud LBS walls go up quickly and efficiently. Bu...
    • Calgary Project - February Update - Duration: 5 minutes, 1 second.

      • 3 months ago
      • 156 views
      Light-weight Building Systems Inc. is completing the Supply and Installation of all Structural Steel, Load Bearing Steel Stud LBS walls and one of several non-combustible floor assembly options.

      W...
    • Calgary Project - Duration: 2 minutes, 9 seconds.

      • 11 months ago
      • 17 views
    • Red Deer Completed Project - Duration: 119 seconds.

      • 11 months ago
      • 23 views
    • Cochrane Comparison - Duration: 2 minutes, 45 seconds.

      • 11 months ago
      • 15 views
    • Cochrane Project Update 01-24-2018 - Duration: 114 seconds.

      • 1 year ago
      • 39 views
      Points West Living - Cochrane
      Video From January 24th 2018

      The lower roof and front vestibule canopy structure are complete and the roofing will start soon.

      The roof structure is complete and the...
    • Cochrane Project Update 12-05-2017 - Duration: 2 minutes, 41 seconds.

      • 1 year ago
      • 43 views
      Light-weight Building Systems Inc. is completing the Supply and Installation of all Structural Steel, Load Bearing Steel Stud LBS walls and one of several non-combustible floor assembly options.

      O...
    • Cochrane Project Update - Duration: 3 minutes, 7 seconds.

      • 1 year ago
      • 263 views
      Light-weight Building Systems Inc. is completing the Supply and Installation of all Structural Steel, Load Bearing Steel Stud LBS walls and one of several non-combustible floor assembly options.

      O...
    • LBS Panels - Duration: 62 seconds.

      • 1 year ago
      • 195 views
      Light-weight Building Systems Inc. provides load bearing steel stud wall panels that are pre-engineered, pre-assembled in a unique mobile wall panel fabrication plant and can be provided complete w...