Apprendre à fabriquer une éolienne a Périple en la Demeure à Limerlé, Belgique
scoraigwind
17,976 views
Wind turbine construction workshop course in Belgium with Jay Hudnall of Tripalium / Ti'eole and Vincent Judalet from ÉolSenegal. Jay brought a 3.6 metre grid tied machine...
-
Production tooling in Dakar
scoraigwind
774 views
Construction tools built by Kassoum in the polytechnic at Dakar for Eolsenegal. These are jigs for welding the 3 metre diameter wind turbine.
-
Repairing an AWP turbine during an SEI workshop on Guemes Island USA
scoraigwind
4,065 views
Small Wind Systems Maintenance and repair workshop with Ian Woofenden and Victor Creazzi in October. Removal of AWP turbine from free-standing 170 foot tower by SEI studen...
-
Homebuilt Wind Generators 2010 continued...
scoraigwind
8,569 views
More from the Wind turbine construction workshop on Guemes Island with Ian Woofenden of Solar Energy International (the sixth time on Guemes). 14-foot and 6-foot diameter m...
-
Homebuilt Wind Generators 2010
scoraigwind
9,813 views
Wind turbine construction workshop on Guemes Island with Ian Woofenden of Solar Energy International (the sixth time on Guemes). 14-foot and 6-foot diameter machines compl...
-
Ballinamore Workshop
scoraigwind
3,287 views
Wind Turbine Workshop with Jimmy and Miriam of Eirbyte at Ballinamore in Ireland September 2010. Building a 3.6m diameter machine for 24 volt battery charging and also a p...
-
Off-grid hydro installation with rocks in pipe
scoraigwind
10,014 views
Very midgy installation, also with many small rocks being drawn into pipeline by the vacuum from closing the intake sluice. Some good pipe flushing action. Turbine is site...
-
Normandy April 2010
scoraigwind
1,519 views
With Tripalium Thomas Plassard at Coulvain, Monchauvet building a 3.6 metre battery charger and also a 1200 and a 600 mm micro turbine.
-
Scoraig wind turbine workshop 2010
scoraigwind
2,862 views
They came from Estonia, Germany, France, Canada, Mexico, Brazil and Argentina to build a 3 metre turbine here on Scoraig. Thanks, guys! And thanks again to William and Ca...
-
Building a 3.6 metre turbine at Leucate with Tripalium
scoraigwind
5,703 views
Ti'eole already had a 2.4 m battery charger on this off-grid site and we built a larger grid tie 3.6 and tested that with only the dump load controller. See also the video...