Upload
291

Subscription preferences

Loading...

Loading icon Loading...

Working...

TheRobbinsCo

Hard Rock TBMs: Cutting through Obstacles at India's AMR Tunnel

5,917 views 11 months ago
Learn how Robbins' field service team successfully worked together with contractor Jaiprakash Associates at the world's longest tunnel without intermediate access. The dedicated team overcame hard and abrasive rock, remote and harsh conditions, and a once-in-a-century flood among other challenges.
Read more
Learn how Robbins' field service team successfully worked together with contractor Jaiprakash Associates at the world's longest tunnel without intermediate access. The dedicated team overcame hard and abrasive rock, remote and harsh conditions, and a once-in-a-century flood among other challenges. Show less
Loading...
Working...
Sign in to add this to Watch Later

Add to