Upload
29

Subscription preferences

Loading...

Loading icon Loading...

Working...

Kleinfelder

San Clemente Dam Decomissioning

343 views 1 month ago
After determining that the aging San Clemente Dam would not withstand a probable maximum flood or maximum credible earthquake, Kleinfelder helped remove the dam and return the Carmel River to its original flow. Show less
Read more
  • North Torrey Pines Road Bridge Retrofit and Replacement

    Kleinfelder developed a specialized retrofit strategy for this bridge utilizing nonlinear time history modeling. The concept was to isolate the superstructure from the existing columns and prestres...
  • Suspended Slab Foundation Project

    Project Manager Jerry Lipstreu explains how Kleinfelder's recommendation of a suspended slab helped facilitate the project completion of the West Oso High School.
  • Goose Creek Bridge Replacement

    Kleinfelder conducted soil and sediment sampling to assess concentrations of hydrocarbons. A Soil and Sediment Management Plan was prepared to enable the Texas Department of Transportation to compl...
  • Whataburger Field, Corpus Christi

    Kleinfelder performed geotechnical services, material testing, and steel inspection for Whataburger Field.
  • Cefe F. Valenzuela Landfill

    Learn more about Kleinfelder's depth of experience in geotechnical engineering and hear Senior Professional Don R. Rokohl explain Kleinfelder's role in quality control, monitoring, and ongoing read...
  • Bolivar Ferry Landing

    Senior Project Manager, Roxie Voran explains how Kleinfelder was able to conduct testing of underwater sediment composition, allowing for dredging operations to commence which benefited ferry servi...