Uploaded videos
1-10 of 12-
Bridge Load Out
ALTONSAED
98 views
We load out the bridge of a Jacket with SPMTs
-
Replacing thruster block in Shipyard
ALTONSAED
99 views
In this job, our customer called us for prepare the heavy lifting of a thruster block of a ship in a shipyard
-
ANIMACIÓN MANIOBRA REFINERÍA.avi
ALTONSAED
347 views
Infografía de la maniobra de cambio de Intercambiador
-
Change of 130 tons heat exchanger
ALTONSAED
725 views
On this occasion, we changed a heat exchanger of 130 tonnes.
-
Transport with SPMTand heavy lift of vessels REPSOL Cartagena refinery (Spain)
ALTONSAED
5,906 views
ALTONSAED belongs to Eurogruas and does designing and engineering of special transports, temporary superbridge, temporary supports of vessels (with ground pressures study),...
-
Transport of 1400 tonnes crane
ALTONSAED
894,514 views
We moved a 1400 tonnes crane fron one jobsite to other
-
Removing archaeological structures in civil works
ALTONSAED
318 views
Removing archaeological structures in civil works. This sample is a medieval furnace of 55 tonne.
This method involves the following steps:
1 - Stabilization of the a...
-
Heavy Lift of Turbines and Generator of Lares Combined Cicle Power Plant.
ALTONSAED
3,022 views
Heavy lift of gas turbine (GE 9FB) and generator. Lares (Portugal) 400 Mw Combined Cicle Power Plant. We used strand jacks and a 400 metric tonnes custom-made gantry .
-
Replacing 60 tons sections of coke drums in a refinery
ALTONSAED
913 views
Maneouver for replacing two sections of cocke drums in a refinery by means of lifting engineering.
Tower masts, hydraulics jacks and skiding sistem were used.
-
special transport of a 600 tons harbour crane
ALTONSAED
35,221 views
This video shows the transportation of a 600 tons harbour crane with center of gravity up to 60 meters high, inside a shipyard. Eurogruas Altonsaed
Advertisement










Play all(12)