Upload

Loading...

Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS)

26,024

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Uploaded on Sep 29, 2011

One of the technologies adopted by the Federal Highway Administration's Every Day Counts initiative, this video illustrates how to build the Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS). It is intended to educate designers, engineers, contractors and inspectors on the fundamentals of the GRS-IBS. The video follows the GRS-IBS Interim Implementation Guide (FHWA-HRT-11-026) found here: http://www.fhwa.dot.gov/publications/...

Included in the video are the following:

• Explanation of GRS and its history of development

• Interviews with designers, owners and construction personnel

• Narrated video footage to explain the construction of the three main components: reinforced soil foundation; abutment; and integrated approach

• Time lapse photography to show the speed of construction

[CLOSED CAPTIONED]

Loading...

  1. 1

    EDC 3 - Innovation!

  2. 2

    Every Day Counts Makes Its Mark

  3. 3

    Every Day Counts (EDC) Overview

  4. Geosynthetic Reinforced Soil-Integrated Bridge System (GRS-IBS)

  5. 5

    Fast 14

to add this to Watch Later

Add to