Loading...

Preparation for Southbound Battery Tunnel Floor and Walls

136 views

Loading...

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Uploaded on Apr 8, 2011

In preparation of installing the tunnel floor and walls, crews lay the tunnel base and drainage for the southbound Battery Tunnel.

  • Category

  • License

    • Standard YouTube License

Loading...

to add this to Watch Later

Add to

Loading playlists...