Loading...

Central Energy Plant - Basic Overview - How a Chiller and Cooling Tower Work Together

404,899 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Jan 30, 2012

http://www.TheControlsFreak.com - Straighforward Information on Commercial DDC Controls and Building Automation Systems.

I apologize for this video as I had some technical difficulties in making it and was not able to do some more editing before the file got corrupt. None the less, this is a very basic overview of a CEP and what equipment connects to what. In the video I point out the following:
- Parts of a Centrifugal Chiller
- How a Cooling Tower works
- Location of chilled and condenser water pumps
- CHW and CDW loop piping

I don't discuss all the sensors, valves and other devices that are required in a fully functioning chiller plant, but I will go into more detail with specific controls strategies in the future.

Loading...

Advertisement
When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...