Loading...

I-75 Partial Bridge Demolition at Ohio 117/309

1,256 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Jun 14, 2013

(June 11, 2013) The partial demolition of the I-75 bridge over Ohio 117/309 in Lima performed by Beaver Excavating proved successful as it was completed in two nights. Nighttime work was performed to minimize the inconvenience to the public. Listen as ODOT Area Engineer Scott Mullins narrates the project overview.

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...