Upload

Loading...

Main arches of Lancangjiang Railway Bridge connected successfully

1,266 views

Loading...

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Nov 16, 2016

After 141 days of construction, which started on June 28, the main arches of the Lancangjiang Railway Bridge were successfully connected on Tuesday, as 130 engineers worked collectively on the project. Due for completion in 2018, the massive bridge is the centerpiece of a new railway line between the cities of Baoshan and Dali in southwest China's Yunnan Province. The new railway bridge crosses the upper reaches of a reservoir that was formed behind Xiaowan, the second highest concrete dam in the world.

Subscribe to us on Youtube:
https://goo.gl/lP12gA

Download for IOS: https://itunes.apple.com/us/app/cctvn...

Download for Android: https://play.google.com/store/apps/de...

Follow us on:
Facebook: https://www.facebook.com/cctvnewschina
Twitter: https://twitter.com/CCTVNEWS
Google+: https://plus.google.com/+CCTVNEWSbeijing
Tumblr: http://cctvnews.tumblr.com/
Weibo: http://weibo.com/cctvnewsbeijing

Loading...


to add this to Watch Later

Add to

Loading playlists...