Loading...

CARMENES 201405-06 aivofn2gpuandvacuumtankatiaacleanroom

166 views

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Jul 4, 2014

25-frame-per-second video recorded in May and June 2014 at the beginning of the assembly, integration and verification phase of the NIR channel of CARMENES inside the clean room of the Instituto de Astrofísica de Andalucía, Granada. Major events are, in temporal order, the installation of the nitrogen gas preparation unit (N2GPU), the NIR vacuum tank and its vacuum system. (Suggestion: play together with the Benny Hill's show theme)

Loading...


to add this to Watch Later

Add to

Loading playlists...