Loading...

Driving the Entire Bay Bridge (Both Directions) During Shutdown 400% Real Speed

29,044 views

Loading...

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Aug 30, 2013

Access to the Bay Bridge is severely limited during the Labor Day Weekend closure. Mark Jones, who is part of the documentation team, drove the length of the bridge in both directions, including both spans, to document the construction zone. The drive was conducted at speeds under 25 miles per hour and slower near construction. The video has been sped up 400% so you can make the nearly 16-mile drive across the new East Span and the historic West Span, and then back to Oakland, in just 13 minutes.

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...