Upload

Loading...

Structural Engineering Institute Wacker Drive Site Tour

2,423

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Uploaded on Aug 11, 2011

ASCE Structural Engineering Institute Site Tour of the Wacker Drive Viaduct Reconstruction project that took place in downtown Chicago, Illnois on July 15, 2011. This is a 3 year project with a budget of about $300 million.

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up Next


Sign in to add this to Watch Later

Add to