Loading...

Robot In 6 Hours - Hartford 2013 - Thursday Build Time Lapse

527 views

Loading...

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Mar 30, 2013

At the 2013 Hartford regional event. We completely disassembled our robot to the frame. Items replaced: Complete re-wiring of the control system with new layout due to battery location move, 2x new drive gear boxes (6 CIMs - single speed), complete re-plumbing of the pneumatics and of course a new super structure.

How did we do it? With the help of FRC 228 and lots of pre-planning before showing up on Thursday. Rebuild time was scheduled to 15 minute blocks, code was developed and tested before showing up.

Loading...

to add this to Watch Later

Add to

Loading playlists...