Loading...

AutoControls.org #658 Pt 3/3: S Ga. Auto.Block w/RR-Concepts SIM

3,695 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Uploaded on Apr 10, 2008

A. SUMMARY: Part 3/3 continuation of demonstration of a single-track Automatic Block operating two S-gauge trains on the same track, using a RR Concepts (http://RR-Concepts.com) 'Switching Interface Module' (aka 'SIM').
[======]
B. RELATED LINKS:
* Pt 1/3: http://youtube.com/watch?v=AQvdO9CzH1c - Part 1 covers (1) Switching Interface Module, (2) Reed Switches (sensors), and (3) Magnets.
* Pt 2/3: http://youtube.com/watch?v=ll1sOX2Cs1Q - Part 2 covers (4) Sensor Activation, (5) Wiring Diagram, (6) Block Locations, (7) Sensor Locations, and (8) Operation with 2 can-motor engines.
* Pt 3/3: (this video) - Part 3 covers (8 cont) Operation (continued), (9) Operation w/1 vintage Flyer engine and 1 can-motor engine, and (10 Operation w/2 vintage Flyer engines.
~~~
* http://track2.com/ingram/plans/s142/1... - web page documentation for this single-track automatic block.
* Please visit the AutoControls "VIDEO INDEX PAGE" at http://AutoControls.org , for a list of LINKS to ALL automatic controls videos (approximately 12), arranged in suggested viewing order.
[======]
This iMovie video was assembled by JamesRobertIngram.com for AutoControls.org (description updated 12/13/2009).

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...