Upload

Loading...

The Lambeau Episodes 3: Weld Fume Extraction

3,050

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Sep 20, 2012

Many of the existing steel support beams and columns that required reinforcement at the expansion of Lambeau Field ran through the heart of the stadium's locker rooms and press facilities, as well as other indoor areas. As such, Miron Construction Co., Inc. relied on a fleet of portable FILTAIR fume extraction systems to keep areas clean and free of welding fume.

For more on this and the whole project, visit: http://bit.ly/MMttnd

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...