Loading...

EVANS Case Study – Prince Rupert Port Authority

132 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Jun 6, 2018

When faced with operational challenges as it looked to future growth, Prince Rupert Port Authority (PRPA) turned to EVANS to creatively solve its challenges while meeting their specifications to better service 14,000 hectares of water (400km of shoreline) and 2,000 acres of land.

At full capacity in their old facility, Prince Rupert Port Authority relied on EVANS to design, build, and install a new control room solution.

Selecting the right partner that could plan the adequate space, technology, and operational needs into the design were critical to future success of the Prince Rupert Port Authority.

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...