Loading...

River Assault - The Bridge Builders

4,016 views

Loading...

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on May 12, 2014

Combat Engineers from the U.S. Army 412th Theater Engineer Command build an Improved Ribbon Bridge to cross the Arkansas River during a training exercise in 2012.

The Improved Ribbon Bridge (IRB) provides wet gap crossing capabilities either as floating bridge or multi-bay raft for combat vehicles and trucks. IRB bays are transportable on trucks, railway cars and transport aircrafts or as underslung load of a helicopter. Total usable roadway width of 4.50 m for single-lane traffic for MLC 80T/96W vehicles.

Film Credit: SPC Mark O'Rear

  • Category

  • License

    • Standard YouTube License

Loading...

Advertisement
When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...