Loading...

2106's 2009 FRC robot week 2 prototype

1,849 views

Loading...

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Uploaded on Jan 16, 2009

The 2009 Robot at the end of week 2. This is the first night be got the pickup and elevator working. The conveyor is about 4 feet too long but we wanted the extra for prototyping. Not bad for only two weeks of work. Now to get the top of the robot designed

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...