Upload

Loading...

CC Ditch Lining Case Study

5,312

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Uploaded on Jul 22, 2011

Short video case study of a 800sqm CC13 ditch lining project in Senghenydd, South Wales. Includes testimonials from the contractor comparing the use of Concrete Canvas against conventional concreting techniques.

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up Next


to add this to Watch Later

Add to

Loading playlists...