Loading...

hydro demolition on A80 with N.E.T. Waterjets robot

1,113 views

Loading...

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Mar 13, 2011

Removing 8 cubic meters of concrete from the expansion joint, deck and buttress. The versatility of the robot allows the operator to position the blast head in the most productive positions especially around heavy re-bar.

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...