MonMan Custom Air Handler Replacement SiteBilt





Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Jun 5, 2014

Watch as an old Air Handler is torn out and a new Custom Air Handler is built on site in less than 2 days.

This Air Handler serves a highly critical medical facility: A Cardiac ICU Wing.

The old air handler was loud, dirty and unreliable. Additionally, it had an air leakage rate that was over 10%. This was costing the hospital significant energy losses.

The time was right to replace the old Air Handler.

The major challenge, besides needing to complete the replacement with minimal hospital operations and patient impact, was the 3 foot wide door that the new 16,280 CFM air handling unit had to fit through.

Traditional methods of replacing AHUs in hard-to-reach areas are:

1) Use a standard, packaged unit, tear it apart in the field, and reassemble in place, hoping the warranty will be honored and the air leakage is somehow kept in check. (unlikely!)
2) Tear out walls, use cranes and lifts to allow a fully assembled or modular air handling unit to be rigged in place. (Yet, how would this work on the interior of a building where you can't tear out walls?)

Both of these options have major drawbacks including time, expense and major site impacts.

Using SiteBilt technology, MonMan can replace old, leaky, inefficient air handlers with new, efficient and clean custom AHUs.

These new units have a 40 Year Casing Warranty, and low air leakage (less than 0.5%) for the life of the unit.

For more information, please visit:


MonMan is a registered trademark of Monitoring Management, Inc.
SiteBilt is a registered trademark of Air Enterprises

All Comments

Comments are disabled for this video.
When autoplay is enabled, a suggested video will automatically play next.

Up next

to add this to Watch Later

Add to

Loading playlists...