Loading...

ASI Construction October Time Lapse.m4v

291 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Dec 21, 2011

Construction on the Nelson Cultural Center, a 34,000 square foot addition to the American Swedish Institute in Minneapolis, Minn., began in late May 2011 and is scheduled to be complete by June 2012. This is a time lapse video from the month of October 2011, made with images captured once every 15 minutes by the construction camera. The Nelson Cultural Center was designed by HGA Architects and Engineers; Adolfson & Peterson is the general contractor for the project. For more information, visit: http://www.ASImn.org/ASI/Campus_Expan...

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...