Upload

Loading...

Sneak Peek of the New Ottawa Greenbelt Pathway

212 views

Loading...

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Uploaded on Nov 7, 2010

On 07 November 2010 I rode as much of the Pine Grove Sector Greenbelt pathway as I could on my 1986 Norco Alpine mountain bike, to see how the trail construction is going. As can be seen some of the trail has been gravelled with "stonedust" and some has not yet. It is supposed to be completed by 31 March 2011. Complete explanation in the NCC press release at http://ncc.gc.ca/bins/ncc_web_content...

Our home website is http://web.ncf.ca/adamandruth/

This video was made on the Kino 1.3.4 video editor running on the Puppy Linux 5.1.1 operating system.

  • Category

  • License

    • Standard YouTube License

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...