Loading...

CTC Demonstration 1

3,005 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Aug 20, 2011

Showing Block 9, Signal 4 and Switch 3 at Southwest Junction. CTC Panel is now fully programmed as per Ch. 25 of Bruce Chubbs C/MRI Applications Volume 2. Showing Code button, Control and Indication codes.

Loading...

to add this to Watch Later

Add to

Loading playlists...