Loading...

Complete small bath remodel time lapse in Austin, TX

50,453 views

Loading...

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Aug 19, 2016

1970's home gutting the bathroom down to the studs. Everything was replaced in the bathroom, electrical, plumbing, drywall, flooring, etc. Entire project took 2.5 months of weekends and weeknights with 3 weeks wait time for the glass shower enclosure. Total spent was $6,262 but that includes $500 of leveling the bathroom floor which was a HUGE mess. This is also for NO labor, everything was done by me except the frameless glass enclosure and the countertop.

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...