1970's home gutting the bathroom down to the studs. Everything was replaced in the bathroom, electrical, plumbing, drywall, flooring, etc. Entire project took 2.5 months of weekends and weeknights with 3 weeks wait time for the glass shower enclosure. Total spent was $6,262 but that includes $500 of leveling the bathroom floor which was a HUGE mess. This is also for NO labor, everything was done by me except the frameless glass enclosure and the countertop.