Loading...

Engineer regiment constructs bridge to maximize mobility

1,688 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Jun 6, 2012

Parry Sound, ON — 2 CER perfects bridge construction in Ex SPARTAN BEAR to increase mobility on battlefield

For an accessible version of this story, please visit: http://www.army.forces.gc.ca

For more information on the Canadian Army and other videos visit: http://www.army.forces.gc.ca

All comments are subject to our terms of Acceptable Use, available online at http://www.army.forces.gc.ca/land-ter....

Subscribe to our YouTube channel http://www.youtube.com/user/CanadianA...
Follow us on Twitter http://twitter.com/#!/CanadianArmy
Like us on Facebook http://www.facebook.com/pages/Canadia...

Loading...

to add this to Watch Later

Add to

Loading playlists...