Loading...

500kV Tower Construction 3 -Line Work Time Lapse

187,466 views

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Jul 20, 2009

Check out the High Voltage Tower Construction parts 1 and 2 also:
Part 1: http://www.youtube.com/watch?v=iTfx9n...
Part 2: http://www.youtube.com/watch?v=YdynKx...

As the Tehachapi Renewable Energy Transmission Line Project nears completion in Bouquet Canyon, crews finish stringing the lines and connecting the insulators on this heavy connecting tower in 100 degree+ heat.

Many time lapse sequences show most of the day's work, including the last line being pulled into place by a winch truck, personnel being ferried onto the tower by helicopter, and numerous airlifts/deliveries of equipment and materials.

Finally, at the end of the day, most of the crew files down the tower leg... Yay - quittin' time! Filmed in Bouquet Canyon, California, July 2009.




The soundtrack is "Symbian Rhythms v2" from the "Silicon Landscape" CD by Technician (yours truly), album and single track available on iTunes: http://itunes.apple.com/us/album/sili... Full artist discography, CDs, and MP3 downloads available at HTTP://technician.jcmdi.com

Enjoy the show!

Note: This is copyrighted material, however, you may download this footage directly from YouTube and use it free of charge in your own non-profit/non-commercial YouTube videos. The full free usage policy, and copyright notice/claim and partner ad info can be found here:
http://jcmdi.com/stockfootage/faq.htm... and
http://jcmdi.com/stockfootage/faq.htm...
(please read both sections before using JCMDI material - Thanks!)

Loading...

Advertisement
When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...