Loading...

El Dorado Timber & Mining Railroad | Fall Loop 2015

4,272 views

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Nov 13, 2015

Narrow gauge three-truck Shay engine looping a 250-foot mainline track. The redwood bridges and trestles are cut to scale. The Shay is battery operated, with remote control by Airwire. Video shot with GoPro Hero4 Silver.

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...