Loading...

The Viper - Week 16 - Fuselage

357 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Feb 6, 2012

To prepare for sending the drawings to the steel fabricator, this week we spent hours pouring over the dimensions to make sure we got everything right. We also had to cut the fuselage to the proper length (80.5" as measured along the bottom).

Loading...

to add this to Watch Later

Add to

Loading playlists...