Upload

Loading...

Next Bridgeland Calgary New Condo Construction Video Update - May 9 2012

447 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on May 10, 2012

Shane Styles interviews the building envelope engineer, Hillary Kernahan with Williams Engineering, about her work to inspect the building envelope to ensure that the drainage plane installed on the building is to specifications. This is an integral part of ensuring that our homes are built to continually high standards. This process with Next condos in Bridgeland is the same for our condo project in Mission called Tribeca.

  • Category

  • License

    • Standard YouTube License

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...