Loading...

Update on Stormwater Project in Gateway Triangle

114 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Mar 22, 2012

The BGTCRA is tying up loose ends on the long-awaited stormwater drainage project for the residential portion of the Gateway Triangle Area. Construction to begin late Spring 2012.

Loading...

to add this to Watch Later

Add to

Loading playlists...