Loading...

Crow Peak Residence Hall Walkthrough

7,496 views

Loading...

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Jul 22, 2013

The Crow Peak Hall is estimated to break ground in early summer of 2014 with a completion date of summer 2015. The nearly 50,000-square-foot new residence hall will connect two existing halls, Heidepriem and Thomas, with a central living area that will be the resident life hub for all three buildings. The connecting link is the living room of the complex which will include a two-story great room, residential kitchen for student use, fireplace, a snack area and multi-media study rooms.

  • Category

  • License

    • Standard YouTube License

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...