Loading...

Infrastructure Update: West Bank Levee Fall 2017

136 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Sep 18, 2017

Updates since the filming of this video:
-All of the Willowridge earthen levee is now maintained by the Lafourche Basin Levee District
-The entire Ellington Phase I system is now above 4.5 feet.
-The existing berm along Ellington has been taken out.

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...