Loading...

Streetcar Greenway: The Complete Tour

2,862 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on May 3, 2015

In 2010, CRSA was hired by the Salt Lake City RDA to develop the existing rail corridor between Central Point Station and Sugarmont Drive in Sugarhouse. Working with the RDA and the Utah Transit Authority, CRSA conceptualized the corridor for use as a greenway and a new streetcar line. CRSA Designer/ Project Manager Steve Cornell and Lead Landscape Designer Bryce Ward narrate.

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...