Loading...

The Vico 4D Scheduling Workflow.wmv

852 views

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Uploaded on Mar 8, 2011

At Vico, we count 3D, 5D, 4D. That's because the construction schedule beings with the Cost Plan and the Tasks that have been assigned to each model element from the BIM. Now we can assign Location Systems for the project and calculate the quantities per location. Now our crews can flow smoothly through the locations based on their productivity rates. Finally, we can communicate the schedule with 4D Manager, a movie derivated from the model geometry, quantities by location, tasks per location, and crew productivity rates. Learn more about Vico's 4D scheduling solutions

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up next


to add this to Watch Later

Add to

Loading playlists...