Upload

Loading...

HEAVY LIFTING AT PORT MACKENZIE.mov

1,837

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Published on Jul 4, 2012

Watch young Port MacKenzie get strong legs under it as it handles 220 tons of cargo—what felt like King Kong coming out of a foreign ship's hold. The continuous electrical cable was wrapped on a spool for 3.4 miles. The cargo is the size of a house and forced the cranes to operate at their working limit. See the extreme rise of the 23-foot tide. Port MacKenzie offloads heavy lifts and high value cargo. The spools are for the Fire Island Wind project and valued at $5.4 million.

Loading...

Sign in to add this to Watch Later

Add to

Loading playlists...