YouTube home #DearMe
Upload

Loading...

Army Package Power Reactor (1957)

1,689

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Uploaded on Jan 21, 2011

SM-1 is a 2 MWe nuclear reactor developed for The US Army Nuclear Power Program (ANPP). It was located at Fort Belvoir, VA, and achieved first criticality in 1957 (several months before the Shippingport Reactor) It was the first US nuclear power plant to be connected to an electrical grid.

http://www.belvoir.army.mil/history.a...

Army Nuclear Power Program From Wikipedia, the free encyclopedia http://en.wikipedia.org/wiki/Army_Nuc...

Army Package Power Reactor Critical Experiment
http://www.ornl.gov/info/reports/1956...

Click to subscribe! http://bit.ly/subAIRBOYD The most viewed aviation channel on YouTube.

Loading...

Advertisement
to add this to Watch Later

Add to