Upload

Loading...

Huey P. Long Bridge New Orleans Widening Project

10,749

Loading...

Loading...

Transcript

The interactive transcript could not be loaded.

Loading...

Loading...

Rating is available when the video has been rented.
This feature is not available right now. Please try again later.
Uploaded on Apr 11, 2011

The Big Lift III - engineers moved a 2,650 ton bridge span into place this weekend on the $1.2 billion dollar widening of the bridge over the Mississippi River in New Orleans. The bridge was built in 1935 and the 7 year widening project is expected to finish in 2013. The widening is a TIMED program project.

Loading...

When autoplay is enabled, a suggested video will automatically play next.

Up Next


Sign in to add this to Watch Later

Add to