  • Part 1: YBITS Concrete Pour - Duration: 6:50.

    • 2 years ago
    • 10,681 views
    Watch as concrete is poured around the steel reinforcement on the new Yerba Buena Island Transition Structure, part of the the new East Span of the Bay Bridge. Part 1 of 3.
  • Cable Compaction Nearly Complete - Duration: 7:19.

    • 2 years ago
    • 677 views
  • Bay Bridge News—Westbound Oakland Touchdown Detour - Duration: 5:36.

    • 3 years ago
    • 345 views
    A description of the Bay Bridge Closure that took place over Presidents' Day Weekend 2012
  • Westbound Bay Bridge CLOSED Presidents' Day Weekend - Duration: 0:31.

    • 3 years ago
    • 387 views
    The Westbound Bay Bridge will be Closed Presidents' Day Weekend Beginning at 8 p.m. Friday, Feb. 17 to 5 a.m. Tuesday, Feb. 21
  • inside_the_bay_bridge_360.mp4 - Duration: 14:49.

    • 3 years ago
    • 1,658 views
    Take a tour inside and on top of the new Bay Bridge
  • Fourth SAS Tower Lift - Duration: 1:47.

    • 3 years ago
    • 319 views
    The fourth lift of the SAS tower was completed March 4, bringing the tower to 480 feet, 91 percent of its final 525-foot height.
  • Design Features of the Bay Bridge SAS Tower - Duration: 2:25.

    • 4 years ago
    • 1,167 views
    Up-close look at some of the design features of the new Bay Bridge SAS Tower
  • First SAS Tower Lift - Duration: 0:48.

    • 4 years ago
    • 318 views
    Images of the first section of the Bay Bridge Self-Anchored Suspension Span tower being raised
  • Bay Bridge SAS Tower—Strand Jacks and Rollers - Duration: 2:02.

    • 4 years ago
    • 5,269 views
    A look at the gear used to raise the massive sections of the Self-Anchored Suspension Span tower
  • Temporary SAS Steel Supports: A Bridge to Build a Bridge - Duration: 2:28.

    • 4 years ago
    • 4,486 views
    With construction of the new Self-Anchored Suspension (SAS) Span, the Bay Bridge team is turning traditional suspension bridge building on its head. Get a look at the unique construction process th...
  • YBI Viaduct Replacement Timelapse (Labor Day 2007) - Duration: 6:46.

    • 4 years ago
    • 554 views
    See step-by-step how crews cut out and replaced a football field-sized piece of roadway on the Bay Bridge over Labor Day weekend 2007. This upgrade provided a seismically safe viaduct over Yerba Bu...
  • West Approach Demolition Timelapse (2006) - Duration: 6:05.

    • 4 years ago
    • 286 views
    Hear interviews with key members of the San Francisco-Oakland Bay Bridge project team, who led the successful, intense three-day demolition of a 1,000-foot-long segment of roadway on the West Appro...
  • Overview of the SFOBB Projects (2009) - Duration: 5:53.

    • 4 years ago
    • 656 views
    Get a taste of what it takes to build one of the engineering wonders of the world: the San Francisco-Oakland Bay Bridge.
  • Overview of the Oakland Touchdown - Duration: 6:12.

    • 4 years ago
    • 338 views
    Find out how crews are building the roadway connecting Oakland to the new East Span -- which includes the iconic Self-Anchored Suspension Span tower.
  • Transition Span Lift - Duration: 5:29.

    • 4 years ago
    • 393 views
    This video showcases one of the largest construction lifts in California history: the 2006 placement of a 1,700-ton, 200-foot-long, 85-foot-wide steel roadway segment 150 feet in the air above the ...
  • West Approach Archaeology & Landscaping - Duration: 4:23.

    • 4 years ago
    • 86 views
    What existed before the West Approach? Watch interviews with Caltrans archaeologists about digging for historical artifacts before construction began. Also, take a closer look at the new First Stre...
  • West Approach Opening Ceremony - Duration: 7:17.

    • 4 years ago
    • 262 views
    Watch highlights from the 2008 ceremony celebrating the completion of the West Approach of the San Francisco-Oakland Bay Bridge. Speakers included Governor Schwarzenegger, Caltrans Director Will Ke...
  • YBI Detour/Labor Day Construction Sequence (2009) - Duration: 1:01.

    • 4 years ago
    • 554 views
    This computer simulation shows the steps the construction crew took to cut out a 300-foot-long, 3,200-ton double-deck section of the bridge 150-feet above Yerba Buena Island and replace it with a 3...
  • West Approach Demolition (2006) - Duration: 1:38.

    • 4 years ago
    • 305 views
    Hear interviews with key members of the San Francisco-Oakland Bay Bridge project team, who led the successful, intense three-day demolition of a 1,000-foot-long segment of roadway on the West Appro...
  • earthquake_simulation_lq.m4v - Duration: 2:13.

    • 4 years ago
    • 2,266 views
    This computer animation shows the potential response of the new Bay Bridge during a large-scale earthquake. It also highlights some of the cutting-edge seismic technologies being applied to the bri...
  • SAS Construction Sequence - Duration: 1:29.

    • 4 years ago
    • 1,526 views
    This computer simulation shows how the complex and iconic Self-Anchored Suspension Span is being constructed.
  • GoogleEarth PressConf (1 of 3).m4v - Duration: 9:11.

    • 5 years ago
    • 430 views
    Part 1 of 3 of a press conference held on February 5, 2010 at the Bay Bridge Public Information Offfice in Oakland, California. Featured are Bart Ney, Bay Bridge Public Information Officer, and Mic...
  • GoogleEarth PressConf (2 of 3) .m4v - Duration: 9:51.

    • 5 years ago
    • 98 views
    Part 2 of 3 of a press conference held on February 5, 2010 at the Bay Bridge Public Information Offfice in Oakland, California. Featured are Bart Ney, Bay Bridge Public Information Officer, and Mic...
  • GoogleEarth PressConf (3 of 3).m4v - Duration: 9:57.

    • 5 years ago
    • 88 views
    Part 3 of 3 of a press conference held on February 5, 2010 at the Bay Bridge Public Information Offfice in Oakland, California. Featured are Bart Ney, Bay Bridge Public Information Officer, and Mic...
  • East Span Flythrough Simulation - Duration: 1:11.

    • 5 years ago
    • 1,879 views
    This computer simulation offers a dazzling flyover of the new East Span of the San Francisco-Oakland Bay Bridge, including sweeping views of the Self-Anchored Suspension Span, the parallel decks of...
  • YBI Viaduct Replacement Timelapse - Duration: 0:58.

    • 5 years ago
    • 1,041 views
    During Labor Day weekend 2007, the entire Bay Bridge was closed—for the first time since the Loma Prieta earthquake—so crews could replace a 350-foot-long, 6,700-ton section of viaduct on Yerba Bue...
  • T1 Footing Box Replacement - Duration: 1:01.

    • 5 years ago
    • 541 views
    A look at the tower foundation of the Bay Bridge's new Self-Anchored Suspension Span. Part of the foundation for the suspension bridge's tower is a steel footing box that is roughly the size of a b...
  • SAS Steel Saddle Casting - Duration: 5:00.

    • 5 years ago
    • 984 views
    A look at the intricate process of fabricating the steel saddles for the Bay Bridge's Self Anchored Suspension Span are being fabricated. The saddles will connect the suspension span's single cable...
  • Westbound Drivethrough - Duration: 1:00.

    • 5 years ago
    • 1,026 views
    After Labor Day 2009, vehicles will travel on a short detour connecting the East Span of the San Francisco-Oakland Bay Bridge to the Yerba Buena Island tunnel. The detour is necessary to allow crew...
  • Eastbound Drivethrough - Duration: 0:33.

    • 5 years ago
    • 586 views
    After Labor Day 2009, vehicles will travel on a short detour connecting the East Span of the San Francisco-Oakland Bay Bridge to the Yerba Buena Island tunnel. This detour is necessary to allow cre...
  • Wrangling Rebar - Duration: 3:44.

    • 5 years ago
    • 2,419 views
    Steel reinforcing bar, better known as rebar, is a mainstay of construction. This video showcases crews working with rebar throughout numerous construction projects on the San Francisco-Oakland Bay...
  • SAS Concrete Pour - Duration: 3:15.

    • 5 years ago
    • 6,160 views
    The video highlights one of the largest concrete pours on the seismic retrofit of the San Francisco-Oakland Bay Bridge. This pour - 2,160 cubic yards of concrete - is for the western support of the...