GE 1.5 Mw Turbine Construction at Mesalands Community College
Uploader Comments (darkpheonix262)
All Comments (14)
-
@ApolloWasReal hello this is my old channel. the thing under the blue plastic is called the DTA, down tower assembly. its the converter that cleans the power from the generator. yes the tower is hollow and there is a ladder that goes the whole length. only one way to the top, climb it. go to my channel and look for a video titled turbine tour
-
What's that rectangular object wrapped in blue plastic and sitting on the base before the first tower section went up?
Is the tower hollow, and if so, does it have a ladder? How else can you get to the top for maintenance?
-
Cranes assembling cranes!
-
watt a great idea watt get it haha lol
-
Hawt. horizontal axis wind turbine.
-
vawt > hawt
-
Dude nice video. I just made a short video of that turbine. Its huge when you stand under it.
Dr Jack
-
Favorited
-
Sorry I ment DTA and not DTS
Looks like a GE ESS WTG, Per the DTS. nice!
noaa555 2 years ago
you are correct
darkpheonix262 2 years ago