Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

[SJ] InterCity nr. 80 from Stockholm C. to Östersund C. closing Ockelbo.

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
14,659
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jan 6, 2011

The train passes the Gruvan level crossing that has not been cleaned from Snow. There is a beach close by so i think that this level crossing is mainly in use on summer time. But now the beach was closed...wonder why? ;)

You can allso see the pre warning light for the next level crossing on the line. When the 3 yellow lights are on then the next level crossings gates are down/lights on red for the cars and pedestrians. When these light are blinking, the gates are up and lights on white. This system tells the train driver weather the crossing is secured for a safe pass.

More info at: http://www.jarnvag.net/index.php/banguide/signaler (swedish)

Ockelbo, Sweden 28.12.2010

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (JuhaVnt)

  • Tänk vilken mardröm att gå över där varenda sommardag! :-/

  • @railmoments Japp...det e ganska tight.

  • Jeez, only 15 seconds, and train appears from the curve!

    This will not probably give too much time to get out of the way, especially if trains move THAT fast!

    And not to mention, that curve SEVERELY restricts the view that people cannot tell if the train is approaching!

  • @kurvjuh True!

see all

All Comments (5)

Sign In or Sign Up now to post a comment!
  • Det duger inte att tåget kommer äfter 17 sekunder.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more