The Cougar River Subdivision was a four-level HO scale layout in Manitoba, Canada. It was owned by my brother-in-law. The layout, which featured both CN and the CPR, was dismantled in Sept., 2009. The trains ran from room-to-room throughout the whole basement (furnace area, past the bathroom, back room, spare room, rec room); a helix in the pantry was used to connect the levels. The upper staging yard was suspended from the ceiling.
Why was the layout dismantled?
AyTrane 2 years ago
Preparation for a move.
jdl562000 2 years ago