Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

BNSF HyRail going to track mode.

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
3,969
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Nov 24, 2009

The ever so evident professional training was hard to miss with this MOW crew setting this HyRail truck on the south main of BNSF Chillicothe Sub at Ruff Brothers.

Category:

Autos & Vehicles

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:

Uploader Comments (kelbym07)

  • Seriously, has this guy never sat on before? Ive never seen anyone need five minutes and two helpers to sit a truck on.

  • Ya it was pretty sad how long it took them.

  • surprised their track and time didn't run out before they got sit on

  • Their warrant was for 2 hours. That was a slow day on the Chillicothe sub.

see all

All Comments (7)

Sign In or Sign Up now to post a comment!
  • The truck is as long as the crossing was

  • setting on the rails is not as easy as it seems.

    a truck that long needs the largest and the longest crossing to set on.

    the longer the crossing the easier it is to set the truck on.

    setting on the rails in a truck like that takes practice.

    those ditching lights/wig wags in the fog lights are just so cool!

  • yardmaster must've been pretty ticked off that it took that long. the longest i've seen a hyrail take is aroud 2 minutes.

Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more