Beaver Dam Downtown Demolition 100 Front Street

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
2,992
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Jun 4, 2009

Five Down, Five To Go

6/5/09 - Demolition of ten buildings in downtown Beaver Dam has reached the half-way point as the final building on the 100 block of Front Street was razed Thursday. Crews also continue to dismantle the Celestial Building on the 200 block by hand. The roof was removed in small sections earlier this week. Guide wires are being used to hold the walls of the structure together. The concern being that if one wall were to fall, it would produce a domino effect that would damage the common walls between Expedition Supply and the Fountain Inn Tavern. As the rubble is removed on the 100 block of Front Street the focus will turn to the 200 block, where the final five buildings will be demolished.

Category:

Sports

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (4)

Sign In or Sign Up now to post a comment!
  • They are spraying to keep the dust down, but not the asbestos, as that would have had to been removed prior to the start of demolition.

  • I guess the water being sprayed to is try and knock down the dust and asbestos flying in the air.

  • those floods were huge!!! Sucks that the river destroyed all the buildings but they were old

  • I remember when this was going on. haha

Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more