Initial flows through culvert fishway at Enoggera Creek - Walaman Fishways

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
501 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Aug 14, 2010

A prefabricated fishway system has been installed in a 2 cell box culvert structure in an urban waterway in Brisbane Australia. Project objectives are to provide for upstream fish passage, retain the integrity and function of the culvert structure, and provide a demonstration site. The video shows initial hydraulic performance for flows up to 400 mm deep.

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (1)

Sign In or Sign Up now to post a comment!
Loading...
Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more