Alert icon
We're changing our privacy policy. This stuff matters.  Learn more  Dismiss

PW 2314 freight train crossing at Roberts, Oregon 12-26-08

Loading...

Sign in or sign up now!
583,510
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Dec 26, 2008

Portland Western 2314 The first train in five days because of the ice storm. PW 3004,PW 3005 (five engines all together) Taken with a Nikon S550 If you like my videos, rate, comment and subscribe to my channel

  • likes, 17 dislikes

Link to this comment:

Share to:

Uploader Comments (ervans)

  • Thanks for posting this! My son and I like to sit and watch the trains on youtube before he heads off to bed.

  • @Engine13Lt Thanks nice to hear

Top Comments

  • Dude's got a lot of shit on his dash. Cool train.

see all

All Comments (88)

Sign In or Sign Up now to post a comment!
  • I counted 72 cars! :D

  • Now THAT is a long train

  • @wingtipvortex And three locomotives.

  • I counted 70  carriages.

  • here in italy the freight trains have a maximum of 30-40 cars and go faster than yours trains, but the level crossing make to wait because the trains,also the passenger trains, arrive about 2-3 minutes after the closure of the bars

  • WTF Longest train ever

  • the country is so large and with a huge amout of rail lines it would be expensive to put up now. Cost vs. savings would not be enough.

  • nuobodus

  • Why aren't american railways electrified??

View all Comments »
Loading...

0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more