Sewer Main Inspection 10/5/2009

Loading...

Sign in or sign up now!
Alert icon
Upgrade to the latest Flash Player for improved playback performance. Upgrade now or more info.
172 views
Loading...
Alert icon
Sign in or sign up now!
Alert icon

Uploaded by on Oct 7, 2009

It starts in the clean-out closest to the house and shows the separation at the second clean-out a few feet away. It continues down to a slight bend from a root (at 18ft), then to another problem (city side) at about 27ft. After pushing a root ball through to the sewer, it goes all the way to the main sewer, and then comes backward to show the problem areas again, ending with a clearer view of the double clean-out separation from under the running water. Pipes are 4 inch PVC

Category:

Education

Tags:

License:

Standard YouTube License

  • likes, 0 dislikes

Link to this comment:

Share to:
see all

All Comments (0)

Sign In or Sign Up now to post a comment!
Loading...

Alert icon
0 / 00Unsaved Playlist Return to active list
    1. Your queue is empty. Add videos to your queue using this button:
      or sign in to load a different list.
    Loading...Loading...Saving...
    • Clear all videos from this list
    • Learn more